Ground Bonding kit 50
a.
Unlock and open the front door.
b.
Lift the top hinge pin up, and tilt the door away from the rack.
c.
Lift the door up and out of the bottom hinge.
2.
Insert an M6 T-25 Torx screw through one end of a 15.24-cm (6-in) grounding strap, and insert it in the
second hole below the upper front door hinge on the vertical frame member of the rack. Tighten the
screw.
3.
Replace the rack front door.
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...