Ground Bonding kit 60
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the extension
kit and tighten.
4.
Repeat the previous steps for the opposite side of the rack.
From the extension kit to the top rack side panel:
1.
Insert a T-25 Torx screw through the end of the 36.83-cm (14.5 in) grounding strap, and secure it to the
top side panel.
2.
Place the other end of the same grounding strap over the grounding lug on the extension kit.
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...