Ground Bonding kit 61
3.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the extension
kit and tighten.
From the side panel grounding lug to the bottom panel grounding lug:
1.
Place the 36.83-cm (14.5 in) grounding strap over the grounding lug on the side panel of the extension
kit.
2.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the side panel
of the extension kit and tighten.
3.
Repeat the previous steps to secure the other end of the same grounding strap to the grounding lug on
the bottom panel of the extension kit.
From the egress panel grounding lug to the bottom panel grounding lug:
1.
Place the 36.83-cm (14.5 in) grounding strap over the grounding lug on the egress panel of the
extension kit.
2.
Place an M8 internal serrated lock washer and an M8 hex nut over the grounding lug on the egress
panel of the extension kit and tighten.
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...