Tie-Down kit 121
Securing the rack to the floor
The following illustration indicates where to drill the holes to secure the rack to the floor. The distances are
measured from the holes on the tie-downs. Have your building structural engineer drill the holes. After your
holes have been drilled, insert a bolt with a washer into each hole to secure the rack to the floor.
1200 mm Full Frame Rack Tie-down Kit
The HP 10000 G2 Series Rack 1200mm Full Frame Pack tie-down kit is designed for greater stability in
seismic environments. This tie-down kit is for Rack SKUs AF092A and AF094A only.
Required tools
The following tools are required for installation:
•
Ratchet with sockets
•
Adjustable wrench
1200 mm full frame rack tie-down kit contents
Item
Quantity
Front tie-down bracket
1
Rear tie-down bracket
1
M8 x 20-mm bolt
12
M8 x 20-mm bolt
12
M8 flat washer
12
This kit might contain extra hardware for your convenience.
Installing the 1200 mm full frame rack tie-down kit
This procedure is only for rack SKUs AF092A and AF094A.
To install the kit:
Summary of Contents for HP 10000 G2 Series
Page 35: ...Cable Management Bracket kit 35 Installation is complete ...
Page 74: ...Hook and Loop Cabling Strap Clip kit 74 ...
Page 75: ...Hook and Loop Cabling Strap Clip kit 75 Installation is complete ...
Page 104: ...Rack Air Duct kit 104 For more information see Baying kit on page 25 ...
Page 125: ...Vertical PDU Mounting kit 125 HP monitored PDU 2 Install the PDU The installation is complete ...