Tie-Down kit 123
Securing the 1200 mm full frame rack to the floor
The following illustration indicates where to drill the holes to secure the 1200 mm full frame rack to the floor.
The distances are measured from the holes on the tie-downs. Have your building structural engineer drill the
holes. Then secure the rack to the floor by inserting a bolt with a washer into each hole.