![horsch Maestro CX Translation Of The Original Operating Instructions Download Page 127](http://html1.mh-extra.com/html/horsch/maestro-cx/maestro-cx_translation-of-the-original-operating-instructions_2164101127.webp)
Metering unit | 13
60013444 • 01 • 01/2021 • en
127
Ø
When the hopper is full, fertiliser residues may be found under the gate valve.
Remove the fertiliser from inside the metering unit before the installation.
Ø
Install the new rotor.
Ø
Check the settings of sealing lip and the concentricity of the rotor.
Ø
Slide in the gate valve and secure it with the indexing bolt.
13.1.3 Adjusting the sealing lip
NOTE
A defective sealing lip or incorrectly assembled supporting plate cause metering er-
rors during sowing.
Ø
The sealing lip must not be torn or damaged – replace the sealing lip at least
once a year.
Ø
Install the side cover with the sealing lip in the metering housing. The sealing
lip must have full contact with the rotor and should be able to generate ap-
prox. 1 mm pre-tension.
ca. 1 mm
Sealing lip
Summary of Contents for Maestro CX
Page 2: ......
Page 29: ...Technical data 4 60013444 01 01 2021 en 29 Maestro 12 CX 5550 6390 5900 2990 3890 2960 6790...
Page 140: ...14 Optional equipment 140 60013444 01 01 2021 en 38 cm 66 cm...
Page 181: ...60013444 01 01 2021 en 181 Notes...
Page 182: ...182 60013444 01 01 2021 en...
Page 183: ......