
101
8-1 Installation
This section includes procedures that can be performed
only by our service engineer.
Move the carriage clamp.
- Move the chain
shown below by hand,
about 5 cm (19.68”) along the arrow direction.
- Push the carriage clamp at its end
and
move it to the left end.
- Remove the foam polystyrene below the car-
riage clamp.
Place three feet under the leveling
bolts shown in the illustration
below.
There are four leveling bolts. Place
three of them first to level the machine.
Adjust the leveling bolts and lift up
the machine so that the machine
becomes level.
- Place a water level on the nipper in two direc-
tions (shown in the illustration below) to check
for level.
- Lift up the machine so that the casters do not
touch the floor.
8. Installation
CAUTION
The BQ-270 weighs about 900Kg (409 lb).
Be careful when moving the machine.
1
BQ-270
PERFECT BINDER
1
2
Carriage Clamp
Chain
2
Top View
BQ-
270
PERFECT BINDER
Summary of Contents for BQ-270
Page 60: ...54...
Page 102: ...96...
Page 120: ...114 9 4 Option Extractor VS 270 1 pc Weekly Timer 1 pc...