39
5.Installation
5-1 Installation
4.
Remove the transport locking screw for
the melt tank.
5.
Fit the trimmings bag to the blower inlet
and secure it with the string.
6.
Connect the ground wire.
7.
Connect the power cord to the power
supply outlet.
Transport Locking Screw
String
Trimmings Bag
Ground Wire
Power Cord
Summary of Contents for BQ-150
Page 1: ......
Page 5: ...IV 4 Troubleshooting 33 4 1 Troubleshooting 34 5 Installation 37 5 1 Installation 38 ...
Page 37: ...32 3 Maintenance PAGE INTENTIONALLY BLANK ...
Page 38: ...33 4 Trouble Shooting 4 Troubleshooting 4 1 Troubleshooting 34 ...
Page 41: ...36 4 Trouble Shooting PAGE INTENTIONALLY BLANK ...
Page 42: ...37 5 Installation 5 Installation 5 1 Installation 38 ...