
Operation
52
Operation restart
Note
When the power starts up, the latest value before the power was previously turned OFF is displayed.
The latest value is taken from the history data read from the CF card. If there are no history data, no
data is output on the display.
1.
Turn ON the power switch and main power switch.
2.
Clean the overflow tank.
3.
Set the reagent bottle in place (refer to “ Installation of reagent bottle” (page 31)).
4.
Start calibration (refer to “ Calibration” (page 53)).
Note
Because there is a possibility that calibration values may have shifted slightly at the time of
equipment start-up, it is recommended that calibrations be performed more often than during
continuous operation while verifying the calibration value.