
Material
237
31
Drain water N-cell
10
542
09:02
32
Inject to N-cell
20
562
09:22
33
Drain water N-cell
10
572
09:32
34
Gauge Samp. L1
(Gauge Span Water) *1
26
598
09:58
“ Corresponding
process to each
TP/TN
measurement
range” (page
239)
35
Gauge Blank Water-12
50
648
10:48
36
Pour Dilute.Tube12
30
678
11:18
37
-
0
678
11:18
38
-
0
678
11:18
39
Stir Dilute.Tube
5
683
11:23
40
Standby
20
703
11:43
41
Standby
80
783
13:03
42
43
44
45
Stir Dilute.Tube
5
788
13:08
46
Gauge Meas.Tube-1
30
818
13:38
47
Tube to N-cell-1
15
833
13:53
48
Drain water N-cell
10
843
14:03
49
Gauge Meas.Tube-1
30
873
14:33
50
Tube to N-cell-1
15
888
14:48
51
Drain water N-cell
10
898
14:58
52
Gauge Meas.Tube-1
30
928
15:28
53
Tube to N-cell-1
15
943
15:43
54
N Inject Reag. A
26.5
970
16:09
55
N Inject Reag. B
26.5
996
16:36
56
Stir N-cell
5
1001
16:41
57
Stir P-cell
5
1006
16:46
58
Drain Sample L1
20
1026
17:06
59
Gauge Blank Water-12
50
1076
17:56
60
Pour Dilute.Tube12
30
1106
18:26
61
Stir N-cell
5
1111
18:31
62
Waiting reaction
300
1411
23:31
63
Stir N-cell
5
1416
23:36
64
Waiting reaction
300
1716
28:36
65
Stir N-cell
5
1721
28:41
66
Waiting reaction
300
2021
33:41
67
Stir N-cell
5
2026
33:46
68
Line Blow L1
300
2326
38:46
69
Stir N-cell
5
2331
38:51
70
Waiting reaction
175
2506
41:46
71
Drain Sample L1B
20
2526
42:06
72
Gauge Blank Water-12
50
2576
42:56
Serial
No.
TP measurement range: 10 mg/L
TN measurement range: 50 mg/L
Process
time (sec)
Accumulated
time (sec)
Accumulated
time
(min:sec)