CTC-CEN Service Manual 07-13 Rev.E
39
9. Place the MH rod in contact with the upper bead breaker
disk.
10. Press and hold the button SW3 to move the lower bead breaker arm outward and place the disk as closest to
the MH rod.
Complete the alignment by moving manually the upper bead breaker arm.
If the machine is without MH arm use the electronic
inclinometer to make the alignment.
Summary of Contents for ATC 900
Page 2: ...CTC CEN Service Manual 07 13 Rev E 2 B L A N K P A G E ...
Page 7: ...CTC CEN Service Manual 07 13 Rev E 7 ELECTRIC DIAGRAM ...
Page 8: ...CTC CEN Service Manual 07 13 Rev E 8 PNEUMATIC DIAGRAMS ...
Page 117: ...CTC CEN Service Manual 07 13 Rev E 117 300KPa 25KPa 400KPa 25KPa ...
Page 119: ...CTC CEN Service Manual 07 13 Rev E 119 B L A N K P A G E ...