![Hofmann ATC 900 Service Manual Download Page 33](http://html.mh-extra.com/html/hofmann/atc-900/atc-900_service-manual_2144254033.webp)
CTC-CEN Service Manual 07-13 Rev.E
33
Disconnect the actuator M2 following par.5.5
Proceed following the next steps.
At the end adjust the actuator following par. 5.5.
Perform the bead breaker arm calibration.
TO CHECK THE 3 TURNS MASTER POTENTIOMETER:
Turn the machine off.
Remove the electric cover.
Position the upper bead breaker arm to the inward end of stroke.
Turn the machine on.
MACHINE UNDER TENSION DANGER OF ELECTRIC SHOCK
Take the multimeter and select it in VDC.
Position its terminals on the potentiometer wires green and white.
Move the arm until end of stroke: the multimeter must display a value from -4.6 to -0.121 on 5K potentiometer
and -9.6 to -0.2 on 10K one.
Summary of Contents for ATC 900
Page 2: ...CTC CEN Service Manual 07 13 Rev E 2 B L A N K P A G E ...
Page 7: ...CTC CEN Service Manual 07 13 Rev E 7 ELECTRIC DIAGRAM ...
Page 8: ...CTC CEN Service Manual 07 13 Rev E 8 PNEUMATIC DIAGRAMS ...
Page 117: ...CTC CEN Service Manual 07 13 Rev E 117 300KPa 25KPa 400KPa 25KPa ...
Page 119: ...CTC CEN Service Manual 07 13 Rev E 119 B L A N K P A G E ...