
3 Piping work and refrigerant charge
Refrigerant and drain hose installation
SMGB0099 rev.0 - 12/2016
120
3.5.8 RPI-(8.0/10.0)FSN3E-(f) - Ducted indoor unit
Refrigerant pipe installation
The location of the refrigerant pipe connections are shown below.
1
2
4
3
1
Liquid pipe
2
Gas pipe
3
Electrical connection
4
Drain pipe
Model
Gas pipe mm (inches)
Liquid pipe mm (inches)
RPI-8.0FSN3E(-f)
Ø19.05 (3/4)
Ø9.52 (3/8)
RPI-10.0FSN3E(-f)
Ø22.2 (7/8)
Ø9.52 (3/8)
?
N O T E
When installing the pipes, leave enough space for maintenance work in the electrical box of the unit.
Drain pipe installation
For condense draining, prepare a polyvinyl chloride pipe with a
Ø25mm (outer diameter).
Fasten the field supplied pipe to the drain hose with adhesive.
The drain piping should be performed with a down-slope pitch
of 1/25 to 1/100.
Connect a syphon, as shown at the figure below.
>75 mm
Slope 2%
Plug
?
N O T E
• Keep Electrical Box and Drain Pipe connection free of refrigerant
pipes.
• If the relative humidity of the inlet air or the ambient air exceeds
80% in the place where the unit is installed, fit an auxiliary drain
pan (field-supplied) below the indoor unit, as indicated in the figure.
!
C A U T I O N
It is very important the syphon installation in order to guarantee the
proper condensate draining.
Indoor unit
Auxiliary drain pan
(field-supplied)
Auxiliary drain pan
(field-supplied)
Indoor unit
?
N O T E
If there is excessive clearance between the drain pipe connection and the drain hose, add a sealing material between both parts in order
to fit and not deform the drain hose.