
47
Trigger Delay
4.5
Trigger Delay
Sets the delay time (trigger delay) from the start of measuring to the application of the first pulse.
If using this function, you can start measuring after the workpiece connection status has stabilized
even if trigger timing and probing timing are the same when combined in the equipment.
Trigger delay
Trigger
(Measurement start)
Pulse application
IMPORTANT
The
OUTPUT
lamp is synced to the EOM signals and so turns on even if the trigger is delayed.
4
Setting the
Test Conditions
Summary of Contents for ST4030
Page 2: ......
Page 14: ...6 Usage Notes ...
Page 32: ...24 Inspecting before Measurement and Verifying Operations ...
Page 42: ...34 Table Copying ...
Page 108: ...100 Setting Dielectric Break down Judgment Conditions ...
Page 132: ...124 Terminal Open Error Setting ...
Page 198: ...190 Editing Files and Folders ...
Page 214: ...206 Interface Specifications ...
Page 248: ...240 Precautions when Processing Test Leads ...
Page 252: ...244 Index ...
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......