21
Inspecting before Measurement and Verifying Operations
Checking the impulse response waveforms
Implement impulse testing on the inspection master workpiece to check that there are no
abnormalities in the instrument or equipment. Set the test conditions according to the workpiece.
Tools to be prepared
Master workpiece (a workpiece close to the mass production master workpiece, or a coil of approx.
1 mH created using reinforced insulation wire)
Calibrate the voltage of the master workpiece beforehand and record the master waveform.
1
Connect the master workpiece to the test lead.
2
Select the table to which the master waveform was saved in test mode.
3
Implement the test.
If the waveform shape (peak voltage, zero‑cross point, etc.) changes greatly
(1)
Being affected by
residual magnetization from the workpiece core.
Apply a degaussing impulse to the workpiece until the waveform stops changing.
You can see how waveforms diverge by turning
on waveform superposition and repeating the
test multiple times.
Reference: “Overlay settings” (p. 112)
2
Preparation for Measurements
Summary of Contents for ST4030
Page 2: ......
Page 14: ...6 Usage Notes ...
Page 32: ...24 Inspecting before Measurement and Verifying Operations ...
Page 42: ...34 Table Copying ...
Page 108: ...100 Setting Dielectric Break down Judgment Conditions ...
Page 132: ...124 Terminal Open Error Setting ...
Page 198: ...190 Editing Files and Folders ...
Page 214: ...206 Interface Specifications ...
Page 248: ...240 Precautions when Processing Test Leads ...
Page 252: ...244 Index ...
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......