20
Hwang Sun Enterprise Co., Ltd.
20 Edition 2012/02
3.3 Preparations Before Operation
1.Load the clean and dry hot melt adhesive
into the melting tank.
2.Close the applicator lid immediately to
prevent contaminants from falling into the
tank.
Note: Switch off the main power and shut
down the external power supply to keep off
the
remained
high
voltage
in
all
connectors.
2) Main Power Switch
Put this “Main Power Switch” on “ON”
position, then the indicator will light,
to show the power of the applicator is on.
3)“START” button for motor power
Press this “START” button to turn on the
motor; when the temperature of the tank
up to the setting point, the motor will
start.
4)”STOP” button for motor power
Press the “STOP” button to shut-down the
motor.
Summary of Contents for HS2510-N
Page 1: ...Hwang Sun Enterprise Co Ltd 0 Edition 2012 02 00 ...
Page 19: ...17 Hwang Sun Enterprise Co Ltd 17 Edition 2012 02 3 2 INSTRUCTIONS OF OPERATION PANEL ...
Page 50: ...48 Hwang Sun Enterprise Co Ltd 48 Edition 2012 02 FIGURE 6 1 5 MANIFOLD ASSEMBLY ...
Page 52: ...50 Hwang Sun Enterprise Co Ltd 50 Edition 2012 02 FIGURE 6 1 6 BY PASS VLAVE ...
Page 54: ...52 Hwang Sun Enterprise Co Ltd 52 Edition 2012 02 FIGURE 6 1 7 FILTER ASSEMBLY ...
Page 56: ...54 Hwang Sun Enterprise Co Ltd 54 Edition 2012 02 FIGURE 6 1 8 WIRING DIAGRAM ...
Page 57: ...55 Hwang Sun Enterprise Co Ltd 55 Edition 2012 02 FIGURE 6 1 9 WIRING DIAGRAM ...
Page 58: ...56 Hwang Sun Enterprise Co Ltd 56 Edition 2012 02 FIGURE 6 1 10 WIRING DIAGRAM ...
Page 62: ...60 Hwang Sun Enterprise Co Ltd 60 Edition 2012 02 FIGURE 6 1 14 PARAMETER SETTING OF INVERTER ...