Installation
APS-90, APS-180 and APS-90-Outdoor-PoE
Requirements
Installation
Basic configuration master
■
For the selection of the installation site it is important that the monitored areas of the
individual devices overlap by at least 100 cm or 3.3 ft (Fig. 63 /1).
■
DNS Service Discovery is available in the network.
■
All devices have activated DNS-SD.
1
Fig. 63: Overlapping of areas
To perform a Multi Sensor Fusion proceed as follows:
Installation of all devices
Calculate the position of the devices.
Install the devices.
Configure the devices with the installation height and the pitch and yaw angle.
Configure the floor area of the devices.
Activate DNS-SD for all devices.
Configuring the master
Configure one device as master.
Scan for slave devices.
List of all devices in the network are shown.
Select all slave devices.
1.
2.
3.
4.
5.
1.
2.
3.