5–82
TNC 370 D
List of Markers and Words
July 02
Marker
S
R
M4054 Battery voltage too low (battery warning at touch probe connection);
evaluated only during the probing process
NC NC
M4055 Enabling the probing process
NC
PLC
M4056 NC stop in all operating modes if stylus is deflected
PLC PLC
M4060 Cycle for tool measurement started
NC
NC
M4061 0 = tool measurement
1 = tool inspection
NC NC
M4062 0 = wear tolerance not exceeded
1 = wear tolerance exceeded
NC NC
M4063 0 = breakage tolerance not exceeded
1 = breakage tolerance exceeded
NC NC
Strobe Signals from the NC to the PLC
M4070 Strobe signal for gear code
NC
NC
M4071 Strobe signal for S code
NC
NC
M4072 Strobe signal for M function
NC
NC
M4073 Strobe signal T code (P code) with TOOL CALL
NC
NC
M4074 Strobe signal T code (P code) with TOOL DEF
NC
NC
M4075 Transfer with FN19 active
NC
NC
Acknowledgment of NC Strobe Signals
M4090 Acknowledgment "gear change completed"
PLC PLC
M4091 Acknowledgment of S code
PLC PLC
M4092 Acknowledgment of M code
PLC PLC
M4093 Acknowledgment of T code (P code) with TOOL CALL
PLC PLC
M4094 Acknowledgment of T code (P code) with TOOL DEF
PLC PLC
M4095 Acknowledgment of transfer with FN19
PLC PLC
Strobe Signals from the PLC to the NC
M4120 PLC positioning axis X active
PLC NC;
PLC
M4121 PLC positioning axis Y active
PLC NC;
PLC
M4122 PLC positioning axis Z active
PLC NC;
PLC
M4123 PLC positioning axis 4 active
PLC NC;
PLC
M4130 Activation of PLC positioning for spindle orientation
PLC NC
M4131 Activation of transfer of the value from D528 to the Q parameter defined
in W516
PLC NC
M4132 Activate datum shift from D528 to D544
PLC NC
M4134 Activation of a gear range and speed through the PLC
PLC NC
M4135 Activation of the selected traverse range (M2816/M2817)
PLC NC
Summary of Contents for TNC 370 D
Page 1: ... z ad snnn Technical Information NC Software 286 02x xx ...
Page 44: ...3 9 Mounting Dimensions LE 370 D July 02 Mounting and Electrical Installation TNC 370 D 3 41 ...
Page 48: ...July 02 Mounting and Electrical Installation TNC 370 D 3 45 3 11 Grounding plan ...
Page 49: ...3 46 TNC 370 D Mounting and Electrical Installation July 02 ...