Section 2: Installation
Operator Manual
T
4000™
(Rev 1)
© Hantle 2010
2.8
Step 8
Using the red switch on the power supply, turn the power on and verify that all
systems are operational. The exterior lights should turn on and as the programming
initializes, the cash dispenser should cycle. If the ATM has not been programmed,
proceed to Section 3 for programming instructions.
END