Appendix F: T4000 Installation Instructions
Operator Manual
T
4000™
(Rev 1)
© Hantle 2010
F.2
Overall
ATM
Installation
Procedure
Prepare
an
opening
of
20”(W)x31
½
”(
H
)
for
ATM
b
o
dy
a
t
th
e
h
eig
ht
of
2
6
½
”
fro
m
th
e
gro
u
n
d
Ass
e
mbl
e
ATM
an
d
pe
d
e
st
a
l
an
d
in
s
er
t
ATM
b
o
dy
(af
t
er
re
m
o
v
ing
fa
sc
ia
fra
m
e)
in
t
o
th
e
opening
fro
m
in
s
i
d
e
th
e
bu
i
ld
ing
I
n
st
a
ll
a
fa
sc
ia
fra
m
e
t
o
th
e
fron
t
of
ATM
b
o
dy
fro
m
o
uts
i
d
e
th
e
bu
i
ld
ing
an
d
p
ull
th
e
ATM
t
ig
ht
t
o
th
e
w
a
ll
fro
m
in
s
i
d
e
th
e
bu
i
ld
ing
I
n
st
a
ll
m
o
v
e
m
en
t
re
st
rainer
s
t
o
b
o
th
s
i
d
e
s
of
ATM
b
o
dy
fro
m
in
s
i
d
e
th
e
bu
i
ld
ing