Anodes
Check the condition of the Anodes every 3 months. Refer to
Drawing
a)
All External Anodes.
Replace any Anode which is less than half its
original size.
Refer to the various sub-sections in Section
for information on Anode replacement.
b)
Tailpipe Internal Anodes.
Also change
the Tailpipe internal anodes.
c) Ensure all fasteners are correctly tightened when fitting new
Anodes.
Refer to Section
f
or information
on Anode replacement.
6
Steering System
Check integrity daily. A thorough check of the whole Steering
System is recommended every 30 hours of operation.
Check the whole Steering System for freedom and range of movement.
NOTE: The HJ-241 Steerable Nozzle System has been designed with minimum clearances between the
Nozzle and Nozzle Housing. This allows optimum steering thrust at any lock with the minimum
of loss. It is important to keep the Pivot Pins and Bushes in good condition to maintain
clearances. Heavy impacts on the Nozzle Housing may deform it and cause the steering to jam.
6
(Contd)
Steering System
(Contd)
If a severe jam-up or impact has occurred, all parts of the Steering
System should be examined for damage. This should include the
following items on the Jet Unit.
1.
Steering Shaft:-
The Steering Shaft should be removed and
checked for straightness, particularly at the Crank end of the
Steering Shaft.
2.
Tiller:-
Check that the Tiller is not bent and that the Steering Shaft
to Tiller attachment bolts are secure.
3.
Steering Crank and Crank Ball:-
Check that the Crank is not bent
or worn. Replace if damaged. The Crank Ball should be checked for
excessive wear.
The maximum clearance between the Crank ball and
the Nozzle Bush is 1.2 mm (0.047ins).
4.
Steering Crank Cotter:-
Check that the tapered surface has no
indentations. Check for thread damage. Replace if deformed or
damaged. Check for security of attachment.
5.
Steering Nozzle:-
Check that the Steering Arm on the top of the
Nozzle is not bent. If any cracks are visible on the underside of the
Steering Arm, or in the web adjacent to the Pivot Boss,
the Nozzle
must not be used and should be replaced.
If no faults are found, the
underside of the Steering Arm should be crack tested using a dye
penetrant technique to prove the integrity of the Steering Arm
before re-use.
Carry out a check of the “ Nozzle Vertical End Float
Adjustment”, refer to Item 12 below.
7
Steering Cable
(If Fitted).
Daily
- Check the Cable attachment points, and the Cable outer mount
points.
(This check is of particular importance as failures have occurred
with these items coming loose)
.
Monthly
- Check the Steering Cable for freedom of movement. If
necessary disconnect to check and grease the cable.
ITEM NO
ITEM
OPERATION
Summary of Contents for HJ241
Page 3: ...www hamiltonjet co nz Installation and Service Manual HJ241 Jet Unit Manual R3A31...
Page 10: ...x INTRODUCTION HJ 241 HSRX...
Page 14: ...xiv INTRODUCTION HJ 241 HSRX...
Page 15: ...Introduction and Product Description System Operation Part A Operator Information...
Page 16: ......
Page 22: ...1 6 1 INTRODUCTION PRODUCT DESCRIPTION 1 3 GENERAL ASSEMBLY DRAWINGS HJ 241 HSRX...
Page 32: ...2 10 2 SYSTEM OPERATION 2 11 HSRX REVERSE SYSTEM HJ 241 HSRX...
Page 34: ......
Page 36: ...3 2 3 DESIGN BASICS 3 2 HULL DESIGN HJ 241 HSRX Figure 9 Loads on the Hull for HJ 241 Jet Unit...
Page 54: ...3 20 3 DESIGN BASICS 3 8 DESCRIPTION OF THE DRY RUN SYSTEM OPTIONAL EXTRA HJ 241 HSRX...
Page 72: ...5 12 5 INSTALLATION 5 8 INSTALLING THE HSRX REVERSE SYSTEM HJ 241 HSRX...
Page 76: ...6 4 6 COMMISSIONING 6 5 AFTER INITIAL TRIALS AFTER ENGINE SHUT DOWN HJ 241 HSRX...
Page 77: ...Fault Finding Maintenance Overhaul Part C Servicing Information...
Page 78: ...HM 811...
Page 104: ...8 18 8 MAINTENANCE 8 8 RECOMMENDED OILS AND LUBRICANTS HJ 241 HSRX...
Page 138: ...9 34 9 OVERHAUL 9 11 HSRX HYDRAULIC REVERSE SYSTEM HJ 241 HSRX...
Page 139: ...Supplementary Technical Information Appendix...
Page 140: ......
Page 142: ...A 2 Appendix HJ 241 HSRX A 2 Loctite Application Guide...
Page 143: ...A 3 Appendix HJ 241 HSRX...
Page 144: ...A 4 Appendix HJ 241 HSRX...
Page 145: ...A 5 Appendix HJ 241 HSRX...
Page 146: ...A 6 Appendix HJ 241 HSRX...
Page 147: ...A 7 Appendix HJ 241 HSRX...
Page 159: ...A 19 Appendix HJ 241 HSRX Comments...
Page 161: ...Technical Drawings Drawings...
Page 162: ......
Page 168: ...SERVICING DRAWINGS D 6 HJ 241 HSRX HJ 241 06 000 Steering Assembly General Arrangment Sht2...
Page 170: ...SERVICING DRAWINGS D 8 HJ 241 HSRX HJ 241 07 001 Reverse Assembly Sht1...
Page 172: ...SERVICING DRAWINGS D 10 HJ 241 HSRX HJ 241 07 002 Blanking Plus No Reverse...
Page 173: ...HJ 241 HSRX SERVICING DRAWINGS D 11 HJ 241 08 001 Installation Details GRP Hull...
Page 177: ...HJ 241 HSRX SERVICING DRAWINGS D 15 HJ 241 09 001 Blanking Plugs For Screen Rake...
Page 178: ...SERVICING DRAWINGS D 16 HJ 241 HSRX HJ 241 09 002 Screen Rake Assembly...
Page 179: ...HJ 241 HSRX SERVICING DRAWINGS D 17 HJ 241 10 004 Hatch Extension...
Page 180: ...SERVICING DRAWINGS D 18 HJ 241 HSRX HJ 241 11 000 Tool Kit...
Page 181: ...HJ 241 HSRX SERVICING DRAWINGS D 19 HJ 241 12 000 Sandtrap engine Cooling...
Page 182: ...SERVICING DRAWINGS D 20 HJ 241 HSRX HJ 241 13 002 Anode Locations...
Page 183: ...HJ 241 HSRX SERVICING DRAWINGS D 21 HJ 241 30 001 General Arrangement...
Page 187: ...HJ 241 HSRX SERVICING DRAWINGS D 25 CT HSE 12 001 Hose Kits...
Page 189: ...HJ 241 HSRX SERVICING DRAWINGS D 27 CT SJK 02 005 Steering Cylinder Seastar...
Page 190: ...SERVICING DRAWINGS D 28 HJ 241 HSRX 61483 Rotary Seal...
Page 200: ...SERVICING DRAWINGS D 38 HJ 241 HSRX 85114 Earth Bonding System Recommendations and layout...
Page 201: ...Notes...