Shroud and Base Assemblies
10-3
P/N 108755-US, Manual revision: AA
S
HROUD
B
OSS
F
AILURE
1.
A shroud boss failure is almost always caused by rough handling includ-
ing improper methods of lifting and carrying, packaging for shipment, and
transporting to and from donor areas.
2.
If the front of the shroud can be lifted without lifting the rest of the Shaker
and the shroud boss is still attached to the link assembly, then the shroud
boss has broken loose from the shroud and the entire shroud must be re-
placed (see Bowing the Shroud on page 10-7 and Shroud Assembly Instal-
lation on page 10-8).
Summary of Contents for SEBRA 1040
Page 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Page 3: ......
Page 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Page 8: ...vi Preface P N 108755 US Manual revision AA...
Page 12: ...x Table of Contents P N 108755 US Manual revision AA...
Page 14: ...xii List of Figures P N 108755 US Manual revision AA...
Page 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Page 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Page 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Page 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Page 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Page 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Page 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Page 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Page 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Page 105: ......