14-2
Power Supply
P/N 108755-US, Manual revision: AA
P
OWER
S
UPPLY
R
EPLACEMENT
Caution:
Always wear an ESD strap when working on the Shaker.
Warning: The Input Power fuse "F1" fuse holder, located on the power supply
PCBA, is exposed when the Body Board and Power Supply PCBA's are removed
from the base. Use CAUTION when handling this assembly.
Note: Schematics are needed for this operation.
Figure 14-1, Location of Fuse Holder
Power supply
inspection
1.
Remove base plate (see Chapter 4, Base Plate Removal on page 4-2).
2.
Check the P1 connector for proper voltages. If no voltage is present, check
F1. If F1 is good, replace the power supply.
Power supply
replacement
Note: Power supply P/N 10403200-xx and P/N 10402405-XXX are no longer in
use. Contact Haemonetics to determine the appropriate replacement.
Power Supply
Assembly
(Intact in Shaker)
F1
Fuse Holder
Summary of Contents for SEBRA 1040
Page 1: ...108755 US service manual Model 1040 Digital Blood Shaker...
Page 3: ......
Page 4: ...Printed in USA Copyright 1999 2010 Haemonetics Corporation...
Page 8: ...vi Preface P N 108755 US Manual revision AA...
Page 12: ...x Table of Contents P N 108755 US Manual revision AA...
Page 14: ...xii List of Figures P N 108755 US Manual revision AA...
Page 20: ...1 6 Introduction P N 108755 US Manual revision AA...
Page 36: ...3 10 Inspection Procedures P N 108755 US Manual revision AA...
Page 40: ...4 4 Parts Access P N 108755 US Manual revision AA...
Page 48: ...5 8 Strain Gauge P N 108755 US Manual revision AA...
Page 60: ...7 6 Tube Clamp Assembly P N 108755 US Manual revision AA...
Page 64: ...8 4 PCB Chassis Assembly Installation P N 108755 US Manual revision AA...
Page 86: ...11 4 Clamp Body Boss Replacement P N 108755 US Manual revision AA...
Page 98: ...13 8 Cap Assembly P N 108755 US Manual revision AA...
Page 102: ...14 4 Power Supply P N 108755 US Manual revision AA...
Page 105: ......