![GSi Autoflow 2000 Series Instruction Manual Download Page 46](http://html1.mh-extra.com/html/gsi/autoflow-2000-series/autoflow-2000-series_instruction-manual_2275079046.webp)
2000 Autoflow
46
ELECTRICAL POWER SUPPLY
Autoflow to Fill System Control Box Interconnect
The Fill System Control Box houses the starter
(s) for the fill system(s) that load grain into the Top
Dry Autoflow Unit and for the aeration fan. DO
NOT run the control wires for the Fill System
Control Box in the same conduit used for the power
wires for the fill system and aeration fan motors.
To wire the Fill System Control to the Autoflow
Control Box do the following.
1)
Run eleven (11) control wires from the
Autoflow Control Box to the Fill System
Control Box.
2)
Connect the wires as shown in figure 24.
Figure 24
Summary of Contents for Autoflow 2000 Series
Page 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Page 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Page 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Page 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Page 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Page 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Page 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Page 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Page 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Page 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Page 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Page 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Page 54: ...2000 Autoflow 54...