Multi-Grain Temperature Sensor
1.
Remove the two wires attached to the grain tem-
perature sensor connected to terminal #22 and
terminal #23 in the fan control box.
2. Mount the four grain temperature sensor brack-
ets evenly around the drying chamber on out
side leveling band posts (figure 5).
3. With bin bolts mount the bracket so the sensor is
10.1/2” above the floor sheet rib.
on all temperature sensor brackets to exit the dry
ing chamber at the same place.
6. Run the cords into the junction box after the junc
tion box has been mounted to the bin.
7. Wire the four temperature sensors as shown be
low and on page 17.
INSTALLATION
band post, and across the top leveling band.
5. Take the cords through the space between the roof
and the top sidewall sheet. There should be enough
4. Wire tie the cords so they feed up the leveling
Figure 4: Illustration of the Grain Temperture Sensor Interconnection
Summary of Contents for Autoflow 2000 Series
Page 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Page 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Page 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Page 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Page 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Page 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Page 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Page 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Page 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Page 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Page 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Page 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Page 54: ...2000 Autoflow 54...