![GSi Autoflow 2000 Series Instruction Manual Download Page 28](http://html1.mh-extra.com/html/gsi/autoflow-2000-series/autoflow-2000-series_instruction-manual_2275079028.webp)
2000 Autoflow
28
INSTALLATION
Drying Chamber High-Level Rotary Switch Installation
1)
Drill a 2” diameter hole through the
roof panel at the location shown in
figure 8.
See Component placement on
page 9 for proper placement in
relation to fill auger.
2) Assemble 1/4” shaft to rotary switch
with 1/4” coupler and rolled pins.
3) Screw 1-1/4” pipe coupler to bottom
of rotary switch.
4) Insert 1-1/4” pipe through adjustable
roof mount weldment. Leave 1-1/4” pipe
sticking out the top of the weldment 3”
as shown in Diagram.
5) Install switch assembly through 2” hole
in roof.
6)
Install paddle to 1/4” shaft
assembly with coupler and rolled
pins.
Figure 8
Summary of Contents for Autoflow 2000 Series
Page 9: ...2000 Autoflow 9 Component Placement INSTALLATION...
Page 17: ...2000 Autoflow 17 INSTALLATION Close Up Detail of Grain Temperture Sensor Wiring...
Page 19: ...2000 Autoflow 19 Plenum hi limit installation INSTALLATION...
Page 22: ...2000 Autoflow 22 INSTALLATION Figure 6...
Page 24: ...2000 Autoflow 24 INSTALLATION Figure 7...
Page 27: ...2000 Autoflow 27 INSTALLATION Figure 9...
Page 29: ...2000 Autoflow 29 INSTALLATION Figure 10 3 00 ROOF MOUNT PLATE COMPRESSION COUPLER...
Page 31: ...2000 Autoflow 31 INSTALLATION Figure 11...
Page 39: ...2000 Autoflow 39 ELECTRICAL POWER SUPPLY Figure 18...
Page 45: ...2000 Autoflow 45 Figure 23 ELECTRIAL POWER SUPPLY...
Page 47: ...2000 Autoflow 47 ELECTRICAL POWER SUPPLY Autoflow to Ground Interconnect Figure 25...
Page 52: ...2000 Autoflow 52 ELECTRICAL POWER SUPPLY Figure 29...
Page 54: ...2000 Autoflow 54...