Trinix NXT — Installation and Service Manual
133
Summary of Installation Procedure
Note
All alarms are now reported as primary alarms. For example, a single fan
failure, which would be a secondary alarm in the past, will now be reported
as a primary alarm.
Powering Up the Routing Switcher
Connect the AC power cords to power up the system.
•
If the LED on the front panel turns to green after the first few seconds
of operation, the system is operating properly.
•
If the LED continues to glow red, power down the system and diagnose
the problem before powering up the system again. For an explanation
of LED alarm lights, see
CAUTION
For TRX-NXT-512x512 Routing switchers: In order to avoid damage, the
power MUST be turned Off before removing/installing the “IFC” cables.
Keep the front door closed as much as possible when the system is running
to maximize the airflow and cooling system. Leave a 2 RU space beneath
the 512x1024 routing switcher to ensure proper air flow.
Note
The front door should be closed during normal operation. Although the Trinix
Routing switcher will function properly with the door open, leaving the frame
open on a continuous basis will result in shortened product life.
Summary of Contents for TRINIX NXT -
Page 10: ...10 Trinix NXT Installation and Service Manual Preface ...
Page 26: ...26 Trinix NXT Installation and Service Manual Regulatory Notices ...
Page 30: ...30 Trinix NXT Installation and Service Manual ESD Protection ...
Page 120: ...120 Trinix NXT Installation and Service Manual Section 9 Planning Guide ...
Page 284: ...284 Trinix NXT Installation and Service Manual Section 12 Broadlinx Installation ...
Page 336: ...336 Trinix NXT Installation and Service Manual Section 14 Broadlinx Console Commands ...
Page 370: ...370 Trinix NXT Installation and Service Manual Section 16 Protected Paths ...
Page 436: ...436 Trinix NXT Installation and Service Manual Appendix 22 Trinix Frame Slot Maps ...
Page 440: ...440 Trinix NXT Installation and Service Manual Appendix 23 Expanded System Sizes ...