D
IRECTION
5771498-100, R
EVISION
6
V
ENUE
™ S
ERVICE
M
ANUAL
Chapter 4 - General Procedures and Functional Checks
4-5
P R E L I M I N A R Y
4-2-2-3
Switch ON the AC Power to Venue™
1) Turn ON the Power ON/OFF switch located behind the silicon cap on the MPB door.
After the Rear ON\OFF switch is switched to ON, wait about 15 sec for initial System SOM
readiness.
2) Press the system
On/Off
touch button(
) on the cockpit (monitor) to boot up the unit.
During normal boot-up, you may observe that:
a.) The unit’s ventilation fans start on full speed, but slow down after the application is loaded.
b.) The Back-End Processor and the rest of the scanner starts with the sequence listed in the next
steps:
1.) Back-End Processor is turned ON and starts to load the software.
2.) The Start Screen is displayed on the monitor.
3.) A start-up progress bar indicating the time used for software loading, is displayed.
4.) The software initiates and sets up the Front-End electronics and the rest of the scanner.
5.) As soon as the software has been loaded, either a 2D screen is displayed on the screen,
indicating that a probe has been connected, or a No Mode screen is displayed, indicating
that no probe has been connected.
NOTE:
Total time for start-up is approximately 1 minute.
Figure 4-2 On/Off Button on Cockpit (monitor)
On/Off Button
Summary of Contents for Venue R1
Page 477: ......