
88
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE F650 FEEDER/BAY PROTECTION RELAY
CHAPTER 5: F650 FEEDER/BAY PROTECTION RELAY
5.1.4
Interfacing to the RTT through the EnerVista F650 Setup Program
The following section demonstrates how to navigate, configure, and monitor the operation
of the F650 Relay using the EnerVista F650 Setup program.
5.1.4.1 Current
Z
Setup
: Enter the Phase CT Ratio, then Save.
FIGURE 5–2: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 5–3: Current Metering