
16
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE 469 MOTOR MANAGEMENT RELAY
CHAPTER 2: USING THE RTT ON SR SERIES RELAYS
2.1.5
Interfacing to the RTT through the EnerVista 469 Setup Program
The following information describes how to configure the SR469 relays and how to monitor
voltage and current inputs using the 469 Setup Software and the RTT.
2.1.5.1 Current
Z
Setup
: Enter the Phase CT Primary, then press Save.
FIGURE 2–3: Current Setup
Z
Metering
: The current values measuerd by the relay can be viewed
on the following screen in real-time.
FIGURE 2–4: Current Metering