82
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE PQM AND PQMII POWER QUALITY METERING SYSTEMS
CHAPTER 4: MOTOR MANAGEMENT & METERING
4.4.5
Interfacing to the RTT through the EnverVista PQM Setup Program
The following section demonstrates how to navigate, configure, and monitor the operation
of the PQM and PQMII Relays using the EnerVista PQM Setup program.
4.4.5.1 Current
Z
Setup
: Enter the Phase CT Primary, then Save.
FIGURE 4–25: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 4–26: Current Metering
4.4.5.2 Voltage
Z
Setup
: Configure the VT Connection Type, enter the VT Ratio, then
Save.
FIGURE 4–27: Voltage Setup