
40
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE SR745 TRANSFORMER MANAGEMENT RELAY
CHAPTER 2: USING THE RTT ON SR SERIES RELAYS
2.4.5
Interfacing to the RTT through the EnerVista 745 Setup Program
The following sections demonstrate how to navigate, configure and monitor the operation
of the SR745 using the EnerVista 745 Setup program.
2.4.5.1 Current
Z
Setup
: Enter the W1 Phase CT Primary, then Save.
FIGURE 2–31: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 2–32: Current Metering
2.4.5.2 Voltage
Z
Setup
: Enable the Voltage Sensing, enter the VT ratio, then Save.
FIGURE 2–33: Voltage Setup