
32
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE SR489 GENERATOR MANAGEMENT RELAY
CHAPTER 2: USING THE RTT ON SR SERIES RELAYS
2.3.5
Interfacing to the RTT through the EnerVista 489 Setup Program
The following sections demonstrate how to navigate, configure, and monitor the operation
of the SR489 throught EnerVista 489 Setup.
2.3.5.1 Current
Z
Setup
: Enter the Phase CT Primary, then Save
FIGURE 2–21: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 2–22: Current Metering
2.3.5.2 Voltage
Z
Setup
: Configure the Voltage Connection Type, enter the
Transformer Ratio, then Save
FIGURE 2–23: Voltage Setup