
CHAPTER 4: MOTOR MANAGEMENT & METERING THE PQM AND PQMII POWER QUALITY METERING SYSTEMS
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
83
Z
Metering
: View the voltage values measured by the relay, in real-
time.
FIGURE 4–28: Voltage Metering
4.4.5.3 Contact Inputs Status
Z
Use the following screen to monitor the status of the contact inputs
as you manipulate the Contact Input Switch on the RTT.
FIGURE 4–29: Contact Inputs Status
4.4.5.4 Contact Outputs Testing
The two contact outputs monitored by the RTT should match the status shown on the
EnerVista PQM Setup.
FIGURE 4–30: Contact Outputs Testing