
56
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
CONFIGURATION OPTIONS
CHAPTER 3: USING THE RTT ON UR SERIES RELAYS
3.1.6
Interfacing to the RTT through the EnerVista UR Setup Program
The following information describes how to configure the UR relays and how to monitor
voltage and current inputs using the UR Setup Software and the RTT.
3.1.6.1 Current
Z
Setup 1
: Enter the CT Primary ratio, and Phase CT secondary, then
Save.
FIGURE 3–8: Current Setup 1
Z
Setup 2
: Select the Phase CT group to which current is being
applied.
FIGURE 3–9: Current Setup 2
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 3–10: Current Metering
3.1.6.2 Voltage
Z
Setup 1
: Enter the Phase VT Ratio, then Save.