
64
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE 369 MOTOR MANAGEMENT RELAY
CHAPTER 4: MOTOR MANAGEMENT & METERING
4.1.4
Interfacing to the RTT through the EnverVista 369 Setup Program
The following section demonstrates how to navigate, configure, and monitor the operation
of the 369 Relay using the EnerVista 369 Setup program.
4.1.4.1 Current
Z
Setup
: Enter the Phase CT Primary, then Save.
FIGURE 4–2: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 4–3: Current Metering
4.1.4.2 Voltage
Z
Setup
: Configure the VT Connection Type, enter the VT Ratio, then
Save.
FIGURE 4–4: Voltage Setup