
76
RTT DESKTOP TEST SET– INSTRUCTION MANUAL
THE 269/269 PLUS MOTOR MANAGEMENT RELAY
CHAPTER 4: MOTOR MANAGEMENT & METERING
4.3.4
Interfacing to the RTT through the 269PC Program
The following section demonstrates how to navigate, configure, and monitor the operation
of the 269/269Plus Relay using the EnerVista 269 Setup program.
4.3.4.1 Current
Z
Setup
: Configure the Phase CT Ratio Secondary, enter the Phase CT
Ratio, then Store.
FIGURE 4–19: Current Setup
Z
Metering
: View the current values measured by the relay, in real-
time.
FIGURE 4–20: Current Metering