![GE AxiChrom 50 Operating Instructions Manual Download Page 191](http://html1.mh-extra.com/html/ge/axichrom-50/axichrom-50_operating-instructions-manual_4090700191.webp)
E
Emptying the column, 105
Evaluation of column perfor-
mance, 100
F
Footprint, 22
H
Hydraulic chamber
Leakage test, 143
Pressure release, 51
Purging air, 76
Hydraulic chamber inlet, 31
Hydraulic chamber outlet, 31,
36
Hydraulic chamber vent
valve, 31, 36
I
Intelligent Packing
Component selection, 61
Custom media, 71
Method creation - custom
media, 71
Method creation - stan-
dard, 65
Packing procedure, 75
Strategy installation, 60
Verified packing method, 65
Wizard, 65
L
Leakage test
Hydraulic chamber, 143
Process chamber, 144
Leveling the column, 55
M
Manual packing
ÄKTA system, 94
Separate packing pump, 98
Mechanical locking equip-
ment, 39
Fitting, 39
Removing, 41
Moving the column, 55
O
Operating pressure, 22
O-ring
Adapter servicing, 113, 126
O-ring replacement, 112
Over-pressure, 51
P
Packing Factor
Wizard setting, 68
Packing list, 30
Packing pressure, 22
Packing the column
Intelligent Packing, 75
Manual packing, 94
Performance evaluation of col-
umn, 100
Pivot stand
Fitting onto column, 37
Tilting the column, 38
Pressure
Max operating, 22
Max packing, 22
Pressure too high in col-
umn, 51
Releasing from hydraulic
chamber, 51
Priming the column, 73
Process chamber
Leakage test, 144
Pump for manual packing, 98
Purging air, 76
S
Safety precautions, 10
General cautions, 11
General warnings, 10
Servicing, 136
Slurry
Concentration, 64
Pouring into column, 74
Preparation, 63
Wizard parameter, 69
Slurry volume factor, SVF, 64
Spare parts
AxiChrom 70 column, 166
AxiChrom 100 column, 176
Recommended to keep on-
site, 155
AxiChrom 50, 70 and 100 columns Operating instructions 28-9331-08 AG
191
Index