CAUTION
Before applying power to the unit, inspect the entire
installation as detailed in
. Check mark those items
when completed.
Inspect for
Description
☑
Auxiliary equipment
•
Look for auxiliary equipment, switches, disconnects, or input fuses/circuit breakers that may
reside on the input power side of the adjustable frequency drive or output side to the motor.
Ensure that they are ready for full speed operation.
•
Check function and installation of any sensors used for feedback to the adjustable frequency
drive.
•
Remove power factor correction caps on motor(s), if present.
Cable routing
•
Ensure that input power, motor wiring, and control wiring are separated or in three separate
metallic conduits for high frequency noise isolation.
Control wiring
•
Check for broken or damaged wires and loose connections.
•
Check that control wiring is isolated from power and motor wiring for noise immunity.
•
Check the voltage source of the signals, if necessary.
•
The use of shielded cable or twisted pair is recommended. Ensure that the shield is terminated
correctly.
Cooling clearance
•
Measure to make sure that the top and bottom clearance is adequate to ensure proper airflow
for cooling.
EMC considerations
•
Check for proper installation regarding electromagnetic compatibility.
Environmental consider-
ations
•
See equipment label for the maximum ambient operating temperature limits.
•
Humidity levels must be 5%–95% non-condensing.
Fusing and circuit
breakers
•
Check for proper fusing or circuit breakers.
•
Check that all fuses are inserted firmly and in operational condition and that all circuit breakers
are in the open position.
Grounding
•
The unit requires a ground wire from its chassis to the building's ground.
•
Check for good ground connections that are tight and free of oxidation.
•
Grounding to conduit or mounting the back panel to a metal surface is not a suitable ground.
Input and output power
wiring
•
Check for loose connections.
•
Check that motor and line power are in separate conduits or separated shielded cables.
Panel interior
•
Inspect to ensure that the unit interior is free of dirt, metal chips, moisture, and corrosion.
Switches
•
Ensure that all switch and disconnect settings are in the proper positions.
Vibration
•
Check that the unit is mounted solidly or that shock mounts are used, as necessary.
•
Check for an unusual amount of vibration.
Table 3.1 Start-up Check List
Start Up and Functional Tes...
AF-650 GP
TM
Design and Installation Guide
3-2
DET-767A
3
3
Summary of Contents for AF-650 GP Series
Page 3: ...Safety AF 650 GPTM Design and Installation Guide DET 767A ...
Page 9: ...Contents AF 650 GPTM Design and Installation Guide DET 767A ...
Page 19: ...Introduction AF 650 GPTM Design and Installation Guide 1 10 DET 767A 1 1 ...
Page 35: ...Installation AF 650 GPTM Design and Installation Guide 2 16 DET 767A 2 2 ...
Page 41: ...Start Up and Functional Tes AF 650 GPTM Design and Installation Guide 3 6 DET 767A 3 3 ...
Page 55: ...About Programming AF 650 GPTM Design and Installation Guide 5 10 DET 767A 5 5 ...
Page 91: ...Application Setup Examples AF 650 GPTM Design and Installation Guide 6 36 DET 767A 6 6 ...
Page 103: ...Status Messages AF 650 GPTM Design and Installation Guide 8 4 DET 767A 8 8 ...
Page 123: ...Warnings and Alarms AF 650 GPTM Design and Installation Guide 10 10 DET 767A 10 0 ...
Page 127: ...Basic Troubleshooting AF 650 GPTM Design and Installation Guide 11 4 DET 767A 11 1 ...
Page 129: ...Terminal and Applicable Wir AF 650 GPTM Design and Installation Guide 12 2 DET 767A 12 2 ...
Page 161: ...Specifications AF 650 GPTM Design and Installation Guide 13 32 DET 767A 13 3 ...