5:3
AK 95 / AK 95 S
HCEN12189 Rev.
10. 2006
Maintenance Manual
Test equipment needed to perform maintenance.
Test equipment
Test equipment:
Tolerance:
Manufacturer:
Gambro Order
number:
Conductivity measurement
± 0.1 mS/cm
MESA, IBP
Pressure measurement
± 2mmHg to ± 200mmHg
± 1% beyond ± 200mmHg
If BPM is installed:
± 0.8mmHg
MESA, IBP, Druck
Temperature measurement:
± 0.2ºC
MESA, IBP
Digital Voltmeter
± 0.5%
Fluke
Measuring glass
± 5 ml
Blood leak Calibration
Cover
N/A
Gambro
K40169001
Gauge pin kit for blood pump rollers
(including three different pins)
T = 1.1 (Stop pin = 1.1*2*0.7 = 1.5mm)
T = 1.6 (Stop pin = 1.6*2*0.7 = 2.2mm)
T = 2.0 (Stop pin = 2.0*2*0.7 = 2.8mm)
T = wall thickness of the blood tubing
Gambro
K40158001
Gauge pin kit for blood pump rollers
(to be ordered separately)
T = 1.1 (Stop pin = 1.1*2*0.7 = 1.5mm)
T = 1.6 (Stop pin = 1.6*2*0.7 = 2.2mm)
T = 2.0 (Stop pin = 2.0*2*0.7 = 2.8mm)
T = wall thickness of the blood tubing
Gambro
K40158002
K40158003
K40158004
Calibration tube kit
N/A
Gambro
K13983002
Drip chamber
N/A
Tube for calibration of
priming detector
N/A
Safety tester
According to IEC 60601-1
Rigel, Biotec,
Metron
*BPM test equipment
N/A
Gambro
K22151001
*BPM Cuff
N/A
Gambro
100900141
*pH buffers
± 0.07 pH units
pH 7 – 100810001
pH 9 – 100810002
Magnet for blood pump cover
Gambro
K19049001
* If installed
Summary of Contents for AK 95 S
Page 1: ...AK 95 AK 95 S Service Manual A better way to better care...
Page 5: ...This page is intentionally left blank...
Page 6: ...Installation Guide AK 95 AK 95 S January 2004...
Page 7: ......
Page 20: ......
Page 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO...
Page 103: ......
Page 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank...
Page 126: ......
Page 152: ...Spare Parts List AK 95 AK 95 S October 2005...
Page 153: ......
Page 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8...
Page 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12...
Page 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11...
Page 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7...
Page 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15...
Page 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3...
Page 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8...
Page 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2...
Page 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3...
Page 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10...
Page 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15...
Page 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board...
Page 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board...
Page 224: ......
Page 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription...
Page 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank...
Page 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank...
Page 247: ...AK 95 AK 95 S Service Manual...