AK 95 / AK 95 S Service Manual
HCEN 9133 Rev. 01. 2004
1:2
Installation Guide
Figure 1. AK 95 S Units.
Ensure that the specified equipment has been
delivered. Do the packages contain the specified
monitor and options? Are there any units/
components missing? Check the additional
packing list (inside the additional package box).
If in doubt, please contact your
Gambro Serv-
ice representative.
Ensure that the voltage specified on the voltage
tag matches the mains voltage. If in doubt,
please contact your
Gambro Service
representative.
The AK 95 S can be installed in most environ-
ments if certain conditions as the temperature,
relative humidity, mains voltage etc. are met.
Operating Environment
AK 95 S:
Ambient temperature:
+18 °C to + 35 °C
Relative humidity:
15 % - 85 %
Air pressure:
70 - 106 kPa
AK 95:
Ambient temperature:
+10°C to + 35 °C
Relative humidity:
30% - 85 %
Air pressure:
70 - 106 kPa
Transport and Storage Environment
Units being transported or stored must be kept
in their original packaging. Units must be
handled en route in accordance with special
instructions. Units can be transported or stored
in the following environment for up to 15 weeks:
Ambient temperature:
-20 °C to +70 °C
Relative humidity:
10 % - 96 %
Air pressure:
50 - 106 kPa
Note!
Units to be transported and/or stored for
more than 15 weeks may only be subjected to
the conditions specified under Operating Envi-
ronment.
Environment and
Physical Data
Unpacking and
inspection
When unpacking, the equipment should be
checked. If the equipment is in any way dam-
aged, proper operation cannot be guaranteed.
Please contact your
Gambro Service
representative.
The packages contain the units and components
shown in Figure 1.
Installation
Physical Data
AK 95 S:
Depth
Width
Height Weight
mm
mm
mm
kg
Machine
600
480
1270
78
Stand
625
580
(all options
included)
AK 95:
Depth
Width
Height Weight
mm
mm
mm
kg
Machine
420
350
1270
62
Stand
680
625
Summary of Contents for AK 95 S
Page 1: ...AK 95 AK 95 S Service Manual A better way to better care...
Page 5: ...This page is intentionally left blank...
Page 6: ...Installation Guide AK 95 AK 95 S January 2004...
Page 7: ......
Page 20: ......
Page 102: ...Maintenance Manual AK 95 AK 95 S October 2006 GAMBRO...
Page 103: ......
Page 125: ...5 22 MaintenanceManual AK95 AK95SHCEN12189Rev 10 2006 This page is intentionally left blank...
Page 126: ......
Page 152: ...Spare Parts List AK 95 AK 95 S October 2005...
Page 153: ......
Page 159: ...HCEN9094Rev 10 2005 7 3 Operator s panel 9 1 3 4 5 6 5 7 5 2 8 6 6 8...
Page 161: ...HCEN9094Rev 10 2005 7 4 Blood pump 10 2 8 3 5 9 4 7 1 6 11 12...
Page 163: ...HCEN9094Rev 10 2005 7 5 Blood pump Motor unit 8 7 6 9 2 10 3 4 5 1 11...
Page 165: ...HCEN9094Rev 10 2005 7 6 Heparin pump 1 2 3 4 5 6 8 7...
Page 169: ...HCEN9094Rev 10 2005 7 8 Magnetic Clamp unit 1 2 3 7 8 12 16 4 5 6 9 10 11 17 18 14 13 19 15...
Page 181: ...HCEN9094Rev 10 2005 7 13 Heater Flow guard 3 9 1 2 10 4 8 7 11 12 13 5 6 3...
Page 189: ...HCEN9094Rev 10 2005 Protective Protective 7 17 Boards 7 1 2 9 6 5 4 3 8...
Page 191: ...HCEN9094Rev 10 2005 1 7 18 Rear box 6 3 7 5 4 2...
Page 195: ...HCEN9094Rev 10 2005 T12AH 250AC BACH BACO HALT 7 20 AC DC 2 4 5 1 6 7 8 9 3...
Page 205: ...HCEN9094Rev 10 2005 7 25 MM I O board 3 2 9 4 6 7 8 5 1 10...
Page 215: ...HCEN9094Rev 10 2005 7 30 UFD Option 4 5 7 17 12 9 6 18 1 6 11 16 8 10 6 13 14 3 2 6 19 15...
Page 219: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board...
Page 221: ...HCEN9094Rev 10 2005 7 32 Boards and Cablings EN1107 10 Step driver board...
Page 224: ......
Page 225: ...9 1 HCEN9160 Revision10 2005 Service Manual Symbols Chapter9 SymbolDescription...
Page 228: ...9 4 HCEN9160Revision10 2005 Service Manual Symbols Thispageisleftintentionallyblank...
Page 234: ...Replacements 10 6 AK 95 AK95SHCEN12078Rev 10 2005 This page is intentionally left blank...
Page 247: ...AK 95 AK 95 S Service Manual...