450
Upgrade and Maintenance Manual
TX2550 M4
System board and components
14.7 System board
14.7.1 Replacing the system board
Note on TPM
I
The system board can be equipped with an optional TPM (Trusted
Platform Module). This module enables third party programs to store key
information (e. g. drive encryption using Windows Bitlocker Drive
Encryption).
If the customer is using TPM functionality, the TPM has to be removed
from the defective system board and connected to the new system
board. For a detailed description, see section
The TPM is activated in the system BIOS.
Field Replaceable Unit
(FRU)
Hardware: 50 minutes
Software: 10 minutes
Tools:
Replacing the system board:
– Phillips PH2 / (+) No. 2 screw driver
– hexagon screw driver 5 mm (for OCP bolts)
– Magnifying glass for inspecting CPU socket springs
(recommended)
Replacing the TPM:
– Bit screw driver
– flat nose pliers
– TPM bit insert
(
*
)
– thin slotted screw driver (2 x 0.4 mm)
(
*
)
(
*
)
For Japan:
– Dedicated TPM screw driver (CWZ8291A)
– TPM module fixing tool (S26361-F3552-L909)
If an OCP module is installed:
– Phillips PH1 / (+) No. 1 screw driver
Summary of Contents for PRIMERGY TX2550 M4
Page 6: ...Upgrade and Maintenance Manual TX2550 M4 ...
Page 36: ...36 Upgrade and Maintenance Manual TX2550 M4 Before you start ...
Page 104: ...104 Upgrade and Maintenance Manual TX2550 M4 Basic hardware procedures ...
Page 136: ...136 Upgrade and Maintenance Manual TX2550 M4 Basic software procedures ...
Page 284: ...284 Upgrade and Maintenance Manual TX2550 M4 Hard disk drive HDD solid state drive SSD ...
Page 372: ...372 Upgrade and Maintenance Manual TX2550 M4 Processor CPU ...
Page 458: ...458 Upgrade and Maintenance Manual TX2550 M4 System board and components ...
Page 480: ...480 Upgrade and Maintenance Manual TX2550 M4 Converting a floorstand model to a rack model ...
Page 516: ...516 Upgrade and Maintenance Manual TX2550 M4 Appendix A ...
Page 518: ...518 Upgrade and Maintenance Manual TX2550 M4 Appendix B ...
Page 558: ...List of all used screws for PRIMERGY Servers Assembled in Germany and Japan January 2017 ...