![background image](http://html.mh-extra.com/html/fujitsu/primergy-rx2450-m1/primergy-rx2450-m1_upgrade-and-maintenance-manual_121113021.webp)
Please ask your local Fujitsu service center for more information.
2.3
Average task duration
Hardware: 10 minutes
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
The following table gives an overview of steps taken into account for
calculating the average task duration.
Step
included
Explanation
Server shutdown
no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance, see
.
Rack removal,
disassembly
yes
Making the server available, removing the
server from the rack (if applicable).
Transport
no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
Maintenance procedures including
preliminary and concluding software tasks.
Transport
no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly, rack
installation
yes
Reassembling the server, installing the
server in the rack (if applicable).
Before you start
RX2450 M1
Upgrade and Maintenance Manual
21
Summary of Contents for PRIMERGY RX2450 M1
Page 14: ...Content Upgrade and Maintenance Manual RX2450 M1 ...
Page 82: ...Power supply unit PSU 82 Upgrade and Maintenance Manual RX2450 M1 ...
Page 156: ...Expansion cards and riser cards 156 Upgrade and Maintenance Manual RX2450 M1 ...
Page 166: ...Main memory 166 Upgrade and Maintenance Manual RX2450 M1 ...
Page 190: ... Switching on the server on page 49 Front panel 190 Upgrade and Maintenance Manual RX2450 M1 ...
Page 218: ...Appendix A 218 Upgrade and Maintenance Manual RX2450 M1 ...
Page 222: ......