Additionally, a lifter is required in the following cases:
–
The server weighs more than 50 kg.
–
The server weighs more than 21 kg and is to be installed above the height of
25 U.
When using a lifter, this installation procedure needs to be carried out by
maintenance personnel.
▶
Pull the rack rails completely out until they stop.
Figure 8: Inserting the server into the rack rails
Basic hardware procedures
46
Upgrade and Maintenance Manual
RX2450 M1
Summary of Contents for PRIMERGY RX2450 M1
Page 14: ...Content Upgrade and Maintenance Manual RX2450 M1 ...
Page 82: ...Power supply unit PSU 82 Upgrade and Maintenance Manual RX2450 M1 ...
Page 156: ...Expansion cards and riser cards 156 Upgrade and Maintenance Manual RX2450 M1 ...
Page 166: ...Main memory 166 Upgrade and Maintenance Manual RX2450 M1 ...
Page 190: ... Switching on the server on page 49 Front panel 190 Upgrade and Maintenance Manual RX2450 M1 ...
Page 218: ...Appendix A 218 Upgrade and Maintenance Manual RX2450 M1 ...
Page 222: ......