Connection instructions
1- Measuring gas flow
The transmitter must be installed above the pipes.
If the temperature of the gas is high, condensate
vessels must be used, as with for steam.
4- Measurement of liquid pressure
The transmitter must be installed below the pipes.
3- Measuring steam flow
Two condensate vessels must be installed between
the transmitter and the orifice. The pipes connecting
the two condensate vessels in the transmitter must be
filled in advance with water. A bleed must be installed.
2- Measuring liquid flow
The transmitter must be installed below the pipes. The
pipes must be installed so that no gas accumulates
in the transmitter. The installation of a reservoir for
collecting gas can be useful.
Isolating valve
Connection
piping
Piping mechanism
Manifold
Orifice plate
Orifice plate
Manifold
Condensate
vessel
Connection piping
Piping mechanism
Atmospheric
pressure
Isolating valve
Connection piping
Manifold
Isolating valve
Piping mechanism
Pressure reading connector
Piping mechanism
Isolating valve
Connection piping
Manifold