Appendix
115
Connect power supply.
Switch on automatic feeder.
Fill boiler with water.
Reinstall device data.
Setup
OK?
Switch the automatic feeder off and again at main switch whilst holding down
.
Check the following settings:
Language:
Check time/date, set if necessary.
Machine:
Assign number and address.
Determine base size.
Heating system electronic/none.
Equipment:
Mixer drain fitted yes/no.
Additive dispenser 1/2 powder or liquid fitted yes/no.
Flushing agent pump fitted yes/no.
Flushing agent sensor no/rod.
Circulation valve fitted no.
Air valve (pulsating compressed air cleaning) fitted yes/no.
Gully valve 2 fitted yes/no.
Mixer temperature sensor fitted yes/no.
Water meter fitted yes/no.
Point electrode fitted yes/no.
Identification:
Set type.
Set squelch value.
ID chip
Calibration scales:
activate yes/no
adjust.
Stations:
Activate internal feeding box(es), controlled by feeder.