Handle Pump Information and Service Functions Using the Web Tool
4.
If you want to copy the changes immediately, see section
Copy Data To/From Pump
Memory
.
Make an Entry
in the Service
Log
It is possible to make own service notes and store them in the base unit and pump memory.
Follow these steps to make an entry in the service log:
1.
Click Setup – Pump info – Service log.
Result:
The Service log window is opened.
2.
• Enter service notes in the Service log edit
fi
eld.
• Click Update.
Result:
”File saved!” is displayed.
3.
Click OK.
Result:
The service log of the base unit is now updated. The changes will be copied
to the pump memory during the next automatic synchronization (every 2 hours).
4.
If you want to copy the changes immediately, see section
Copy Data To/From Pump
Memory
.
136