Copy Data To/From Pump Memory Using the Operator Panel
Copy All Data
from MAS to
Pump Memory
It is possible to copy any recent changes or latest measurements immediately to the
pump memory, for example before service, to make sure the latest data is stored in the
pump memory before removing the pump.
Follow these steps to copy all data from MAS to the pump memory:
Step
Action
Result
1
• Go to General con
fi
g (2.5) in
the Setup menu using up/down
arrow.
• Press OK and use down arrow to
enter menu Pump memory sync
(2.5.6).
2
• Press OK and use down arrow to
enter menu Copy all from MAS to
PM (2.5.6.2).
• Press OK to perform
Copy all
from MAS to PM
.
“Execute sync?” is displayed.
3
Press OK to con
fi
rm.
• “Wait” is displayed during the
synchronization
• After synchronization “Sync
executed” is displayed brie
fl
y and
then menu Copy all from MAS to
PM.
• The pump memory now contains
the latest operation data.
141