Seite 92 Kap. II PANDA 6000ND PMS Betriebsanleitung/Operation manual
...:\Handbuch\Marine\2-spaltig\Panda6000ND\p06m2v02.p65
01´02
Made by ICEMASTER GmbH Germany
4.7.1 AC Board-System Installation
ATTENTION! Before working on the System read the section
Safety Instructions in this Manual.
The AC connections for the generator are pre-installed for the manufac-
turer.
The installation of the 380/230/120V power system starts at the connec-
tion terminal box of the generator, all the required terminals are mounted
*.
Ensure that the power supply system installation conforms to
all of the required electrical system safety regulations of your
local authorities. Only a qualified electrician should install the
electrical system.
4.7.1 Anschluß an das AC-Netz
ACHTUNG! Vor Bearbeitung unbedingt das Kapitel Sicher-
heitshinweise in diesem Handbuch lesen.
Die Wechselstromanschlüsse sind, soweit für den Betrieb des Generators
erforderlich, schon vorinstalliert.
Die Netzanschlüsse für 380/230/120V werden vom Generatorklemm-
kasten aus verlegt *. Die Anschlußklemmen sind hierfür vorbereitet.
Bei der Installation des elektrischen Systems muß unbedingt
darauf geachtet werden, daß die örtlichen Vorschriften der
jeweiligen Elektroversorgungsunternehmen eingehalten wer-
den. Hierzu gehört insbesondere die Einhaltung der Vorschrif-
ten für Schutzleiter, Personenschutzschalter etc.
DC Installation
DC Installation
Anschlußplan
Connection diagram
01. Generator
02. Batterie
03. Bordstromverteiler
04. Fernbedienpanel
05. Kraftstoffpumpe
01. Generator
02. Battery
03. Distribution panel
04. Remote control panel
05. Fuel pump
*) Alle Absicherungen und elektrischen Schutzmaßnahmen müssen
bordseitig gestellt werden.
*) All electrical safety installations have to be made on board.
K09PMPNB950
01
02
03
04
05