Maintenance Instructions
Page 62 Panda_6000i_System_eng_s01835.book.R01 - Chapter E: Maintenance Instructions
16.1.09
2. Open the ventilating screw on the ther-
mostat casing.
Fig. E.5-3: Ventilating screw on the thermostat housing
3. Now the cooling water is only filled over the external expansion tank. This is connected by 2
hoses with the genset.
The external expansion tank should be filled in the cold condition only up to maximally
20%. It is very important that a large extension space over the cooling water level remains.
Repeat this procedure several times.
If no change of the cooling water level can be determined, the generator is started for 5 minutes.
Afterwards repeat the ventilation two - three times.
It is meaningful to repeat the ventilation procedure also after some days again to guarantee that
in the system remained bubbles are removed.
The ventilation screw
above the cooling water
pump casing may not
be opened under any
circumstances,
whilst
the generator is run-
ning. Air will be sucked
through the opening, if this should happen
by mistake. Venting the whole system
afterwards is necessary and very difficult.
Fig. E.5-4: Ventilation screw above the cooling water pump casing
10
Summary of Contents for Panda 6000i PMS
Page 9: ...Panda 6000i PMS 230V 50Hz 6kW Fischer Panda GmbH Panda 6000i Part 1 Generator Manual ...
Page 14: ...14 Socket wrench set Hexagon wrench keys ...
Page 18: ...18 Intentionally Blank ...
Page 92: ...Panda iControl Page 92 Chapter A Panda iControl Panel_iControl_eng fm Intentionally Blank ...